Correction

In the February 6th BOD Meeting recap, SU misidentified the successful bidder for the Irrigation Mainline Replacement. The post referenced FMC (although with a question mark, due to uncertainty), wherein the successful bidder was SNC (Sierra Nevada Construction, Inc).

Thanks to Board Member Frank Leto for the correction.